Location:
Jubail, Saudi Arabia
Customer:
Saudi Aramco
Equipment:
Two new sulfur pelletizers, upgrade existing
equipment
Capacity:
10,500 tonnes per day
In
Service: 2002
|
Devco
was awarded this contract by Saudi Aramco following
a competitive international tender. Devco's contract
covers the supply of two 85 tonne per hour wet prill
sulfur forming units plus equipment to update Saudi
Aramco's four existing units. Total sulfur forming
capacity after completion will be 10,500 tonnes
per day. The contract was awarded in March 2001
and shipment to Saudi Arabia was completed 1Q02.
Location:
Jubail, Saudi Arabia
Customer:
Saudi Aramco
Equipment:
Three sulfur pelletizers, stacking conveyors
Capacity:
4,500 tonnes per day
In
Service: 1986
Devco
was awarded this contract in competitive bidding
to design, procure and construct three sulfur pelletizing
units. The design included a completely automated
operating system and a complete water recovery,
neutralization and recycling program to conserve
water consumption.
Location:
Berri, Saudi Arabia
Customer:
Saudi Sulfur Company (Devco Affiliate)
Equipment:
Two sulfur pelletizers, stacking conveyor, storage
area, truck loading system; storage, shiploader
and berth at Port of Jubail
Capacity:
5,000 tonnes per day
In
Service: 1984
Following
an explosion at Aramco's existing sulfur forming
plant at Berri, Devco moved the two units from Shedgum
and erected them at Berri. Total time from authorization
to commissioning was 43 days. Devco also remelted,
purified, and pelletized 60,000 tonnes of basepad
sulfur material.
Location:
Shedgum, Saudi Arabia
Customer:
Saudi Sulfur Company (Devco Affiliate)
Equipment:
Two sulfur pelletizers, stacking conveyor, storage
area, truck loading system; storage, shiploader
and berth at Port of Jubail
Capacity:
3,000 tonnes per day
In
Service: 1980
Devco
designed, constructed and operated this sulfur forming
facility adjacent to an Aramco gas processing plant.
The pelletized sulfur was trucked to the Port of
Jubail where Devco operated a 14,000 tonnes per
day shiploading facility. Devco marketed the sulfur
worldwide - over 2.3 million tonnes in 3 years.
Devco also supplied and operated facilities to reclaim,
remelt, purify, and pelletize 800,000 tonnes of
blocked sulfur.
|